
Lakeside Drive - Bullhead CitySWI designed 2,600 feet of widening, edge improvements, and storm sewer for this 4-lane arterial street in Bullhead City. SWI developed and analyzed culvert, box culvert, and low-water crossing alternatives where a wash crossed the Lakeside Drive and Riverview intersection. Scope also included working with individual business and home owners to implement parcel-specific design solutions. On the Lakeside Drive project, Shephard-Wesnitzer has done an admirable job of designing a road that matches project need to available budget." This project was completed in 2005.
Post-construction aerial
Post-construction ground
|